As a part of a comprehensive reconstruction on the new line, a modern track will be built, there will be a complete electrical reconstruction, the safety equipement will be replaced, the train control system and conductor systems will be replaced, the passenger areas and the stations will be renovated. The renovation of the trains have already started. The first refurbished trains have been in operation since March of 2017.