When you can see the subway tunnel from the surface

As we previously reported, during the reconstruction of metro line M3 works both under and above the ground are underway.

On the northern section of the line shafts of the future elevators are being built, machines preparing and reshaping the area.

By removing some sections of the concrete slabs an opening was created at Temesvár utca, where transportation of the bigger machinery takes place. This step ensures that the workflow is going on with the same speed, since there is no need to move the materials all the way along to Kőér utca vehicle depot, mentioned beforehand.


For more pictures click here.